Installation
Installation materials are not included and must be purchased separately. For wall installation, we recommend using MF375 Monarch Z-Clips. For ceiling installations, we recommend using MFCEIL-H Monarch Ceiling Clips.
For most installations, we recommend a climatic temperature between 55 to 75 degrees Fahrenheit and 30% to 50% humidity level. Environments that do not meet these criteria will cause wood to experience shrinking and swelling issues that damage the product. We cannot guarantee our product’s performance in such environments.
Sustainability
Potential LEED Credits: M&R – Material Ingredients – Declare, M&R – Sourcing of Raw Materials – Material Reuse, IEQ – Low Emitting Materials – Wall Panels, Composite Wood
Declare/Red List: LBC Red List Free
Standard Finishes: Low Emitting/Low VOC
Source Options: Select Harvest, Urban Wood, FSC® License Code (FSC-C199866)
End-of-Life: Panels can be reused in their entirety. Learn about our Wood Wall Panel Takeback Reuse Program.
Read Our Commitment to Sustainability and download our Sustainability Matrix.
Reach out to Emma Kiel at emma@urbanevolutions.com with sustainability-related inquiries.
Notes for Specifiers
If you are planning to specify Veneer Wood Wall Panels with urban or select harvest wood sourcing, please reach out as soon as possible to notify us of your project so we can ensure you receive the material you need. Our responsible sourcing practices require careful inventory management to accommodate all projects. We recommend the following steps during each project phase to ensure ease during the process – please contact us for more information and assistance.
Steps for Specifying Reclaimed and Reused Materials
Schematic Design: Ensure reclaimed/reused materials are the basis of design.
Design Development: Order larger samples to showcase variation and finish selection.
Construction Documents & Bidding:
- Provide square footage estimates to Urban Evolutions.
- Send technical specifications to bidders.
- Include full product description in the specifications for the architect.
- Include full detail note for the design architect.
Construction Administration:
- Require the general contractor to contact Urban Evolutions.
- Schedule a meeting to review reuse features, lead times, inventory options, and technical specifications.